Publications and White Papers

Starting in 1999, Wilson Bay North Carolina was the first attempt to manage a coastal water body using hydrolibria methods.  Wilson Bay Flow Project link is to a paper written in 2001 on the early results.  Some sixteen years later the system is still in operation and has helped reclaim one of our coastal waters.

Wilson Bay Poster contains some current (2016) descriptions.

Wilson Bay Flow Project

Wilson Bay Poster updated with 2016 conditions

FIRST LARGE DISC (8’ dia.) PROTOTYPE NEAR DAYTONA BEACH, FL. ACHIEVED 1 m3/sec flow with ~70 watts.